

Trestles done! Elevated Train is up & Running!
I finished building the trestles. Installed the elevated train track and did a test run. Everything worked perfectly.


Cleaning & Building
Just doing a little cleaning up, and added a few billboards!


Roadbed!
Tonight I installed the roadbed for the lower track.


2nd Ledge!
The 2nd ledge for the Batcave is in. The 2nd ledge contains the turntable for the Batmobile!


Batcave Lights are Working!
Tonight I wired both sides of the Batcave. They are now both fully powered & lighted!