Another ledge done & the Batsignal is WORKING!
So today I got the last ledge done for the Batcave, and the Batsignal is WORKING!


Trestles done! Elevated Train is up & Running!
I finished building the trestles. Installed the elevated train track and did a test run. Everything worked perfectly.


Cleaning & Building
Just doing a little cleaning up, and added a few billboards!


Roadbed!
Tonight I installed the roadbed for the lower track.


2nd Ledge!
The 2nd ledge for the Batcave is in. The 2nd ledge contains the turntable for the Batmobile!


Batcave Lights are Working!
Tonight I wired both sides of the Batcave. They are now both fully powered & lighted!


Batcave & Lights
I attached the Batcave to the end of the train table and I have one set of lights wired!


All moved in to the new place.
Man-cave looking good, so Let the construction begin!


The Lights are in!
The lights are in. Now I just have to wire them up and give them power. Another step done!


The Ledges are Black!
I painted the Batcave ledges Black. I painted them using Flex Seal. I might be adding some effects to my Batcave so I used it instead of...